So it’s a bank holiday weekend and I was looking forward to lots of time in the shed, but on friday a nice lady held me down and shoved a screwdriver and a pair of pliers in my mouth so I wasn’t really up to much woodworking on the Saturday, but at least the extraction didn’t cause too much pain after the fact so today I decided to hit the shed and get on with some stuff, and I thought I’d start with some resawing.

The fence they ship the Titan bandsaw with is ridiculously awful, so this is what I normally use – just a length of extruded aluminum that normally serves as a straightedge when planing. I must see about getting a wider box section for this job though, the underside of the table has ribs so it’s not so easy to find a flat spot to get the clamps on without tipping the fence over when you clamp. But after some faffing about I got it all set and started to feed in the beech, and getting pretty good results (This is 75mm wide material, the upper limit for the machine).

Nice straight clean cuts, minimal saw fuzz, no wandering or blade drift, I was happy with that. Then on the last board…

Just literally ground to a halt mid-cut. Motor’s still spinning, but the blade’s not moving. I was sure I’d overheated the little motor or something so I turned everything off and let it sit for a half-hour and then tried again, but to the same result – the blade would move allright, but the minute it hit the wood, it stalled out and stopped while the motor kept spinning. So I opened up the lower box and sure enough…

Note, the belt hadn’t snapped, I cut it out of the bandsaw to save time, the problem is that the teeth are all stripped off the inside of the belt (note the melted fuzz on the remaining third of the teeth, and there were a lot of completely stripped off teeth on the bottom of the lower bandsaw cabinet). It’s a 124XL037 belt in case this ever happens to you, and like the bearings, these belts are industrial lego. If you don’t need them fast, you can get a box of ten from aliexpress for $16; if you need them tomorrow, Radionics will ship you two for the same price in a day or so. So I’ll be sorted before the end of the week, but it’s still a bit of a pain in the fundament.

Still though, got most of the boards done.

That bottom one is 100mm wide, it wasn’t getting resawn, it’s to be thicknessed. And the remaining board I was mostly through so I finished resawing it by hand.

Yeah, still not my favorite part of this hobby. But beech turns out to be nice to saw.

Then laid out the parts for the next project…

Bit of a glue-up panel for the back…

That’ll be ready tomorrow and then I can continue planing the parts. Then the outside frame gets dovetailed, the inner shelf and bottom get housing joints, I’ll rebate the panel into the frame at the back and thickness the door and that’ll be that.

Yeah, so only another six months 😀

And then maybe some stringing for decoration… or some carving… 😀

I also got some walnut pieces rough-cut from an offcut from the sidecar cot to be used in the experimental box. I’m just not looking forward to resawing that to a usable thickness and I hate thicknessing walnut by scrub plane, it feels like such a waste. Oh well. Frame saw time maybe.


27
May 18

A busy weekend…

…and almost none of it spent in the shed, but for once that wasn’t a bad thing 🙂

(I know this might be confusing if you’re reading this outside Ireland, but check the international news, we wound up in it almost everywhere). Herself was canvassing and leafletting and doing her part for this for the last few weeks, and we were all a bit on edge throughout because the No campaign were being violent and abusive and just plain nasty in an attempt to drive down turnout for the vote, but in the end people remembered thirty-five years of suffering and overwhelmingly voted yes. After which, to be frank, we were all a bit weepy and wiped out. Herself went in to Dublin Castle for the official announcement, and I went off with Junior to the grandparents to decompress and grill some hamburgers, and we all went home and crashed that evening with a plan to not even move the next day if we didn’t have to.

But I figured the shed might help me unwind a little so…

First things first, grind a camber onto the new scrub plane…

I’m always convinced this stage is going to ignite six litres of shellac and finishes so I’m not hugely fond of it but needs must…

Then on to the stones to fine tune the bevel and hone it.

Well, that worked…

And a slightly less aggressive camber than Sid’s. So, Sid gets relegated to the toolbox for the foreseeable; he may be dug out again if I ever need to thickness a lot of pine or something like that, but he tended to bite me as much as he’d bite the wood, so I’d rather stick with the new plane, it lets me bleed less on the work which will hopefully improve the final finish of pieces. Happily, I didn’t have to do anything to the mouth, so the guilt of mangling an old but perfectly fine Record #04 wasn’t triggered.

In its new home.

And now my wall is almost 100% record (bar the two stanley block planes and the preston spokeshaves). Which is odd because I didn’t start out looking to make a collection, but I seem to have wound up with one anyway.

Oh well. Time to actually use the sodding things now. I have some rough cut pieces still ready to start in on…

But I’m not actually touching those today, I wanted to get a feel for what beech is like to work so I’m prepping some pieces for a simple box first from the offcut left over from doing those rough cuts.

Ripped the offcut in half and planed to matching width.

Then flattened one side and thicknessed with the new scrub plane. Honestly, this is not my favourite part of this hobby.

And it generates a lot of mess…

But I got the pieces thicknessed and flattened on both sides, and shot the ends square and then cut out 8″ and 5″ lengths for the sides of the box.

…and I don’t like the proportions. Hm. I wanted to use the rippled sycamore for the lid here, so I think I’ll let it dictate the proportions; that should shrink the width by a solid inch here which I think might work. It’ll be a japanese style tool box thing when its done, if a little bit fancier than those normally get made because I want to use pegs instead of nails and try to make it pretty. We’ll see if it works 😀

I’ll probably just futz with the proportions stuff and maybe cut the housing joints here tomorrow, and then I want to get on with the resawing and prep work on the pile of rough cuts for the box, it’s for a present and I’d like to get a start on it. And I’m seriously thinking about taking this Friday off as it’s the June bank holiday weekend and a four day weekend right now sounds almost scandalously luxurious…


21
May 18

Pottering about

Last project finished, next one not properly started yet (just have the rough cuts done) and another in mind but not off the notepad yet. So now’s the time to work on the shed itself…

That’s the dust collection for the shed (it’s collapsed because the vacuum hose got clogged with shavings and the shop vac managed to pull enough air out of the barrel for atmospheric pressure to crush it). It’s a bit… big. For the shed at least. So a while back, I got a smaller drum.

And it’s been sitting there since I bought it, getting in the way, because I was trying to get other stuff done. So…

Out with the old…

And mark out and measure for the minicyclone seperator in the lid of the new drum, cut out the large hole with, of all things, the lie-nielsen radius cutter I was using for stringing on the last project, and then drill the holes for the attachment screw and fit it. In the end I didn’t use the sealer though, I’m not sure if it’s needed just yet.

It’s a wee bit smaller 😀
May need to re-jig how it’s held upright because unlike the older drum, this one has no side handles to thread with bungees.

Much smaller and neater. I didn’t use the sealer yet – I was mucking about with a safety valve to stop it getting crushed like its predecessor, but discovered that even with the 10mm hole in the lid wide open I was still getting suction on the main hose, and if I blocked that main hose, the 10mm hole wasn’t enough to stop the vacuum trying to collapse the drum. May need to rethink that a bit – it could just be that the smaller size results in far more rigidity and I don’t need it. Or I may need it later due to wear and tear. We’ll see.

Either way, more room!

And more clamps! There were a few 3″ clamps going for a fiver per pair on ebay so I grabbed them. They’re getting some PTFE lubricant here. At some point I really ought to take off the old paint and repaint all of these but I like the old record blue and I’m not sure I want to go into learning how to stove enamel stuff in the same oven we cook dinner in…

(Oh and the calculator is because I can’t multiply by 1.618 in my head)

And this is the next project after the next one; it’s not off the notepad yet but I was looking at how beech and walnut look beside the rippled sycamore that I want to use in it, trying to figure out colour contrasts so things look matched rather than looking garish, but also letting me keep mucking about with stringing.

I do have one shed task left though, and that’s to grind a camber in the new scrub plane blade. It won’t be anywhere near as severe as Sid’s camber, that was something like a 4″ camber, this will be about 7″ or so. I’ll get to that next, and then I’ll get back to the locker.